The arch of the bridge in the Crimea began to be transported to the Seine estuary supports

© Photo : Official website information, the construction of the Crimean metapathology railway arches for collection on planetemuThe arch of the bridge in the Crimea began to be transported to the Seine estuary supports© Photo : Official website information, the construction of the Crimean bridge

Started sea phase of the operation to move the railway arch bridge across the Strait Karceski weighing six thousand tons of floating supports for the installation on the Seine estuary supports, according to information center «the Crimean bridge».

«Began transportation of railway arches from the Kerch coast in the waters of the Kerch Strait,» — said the press service.

Lawsystem withdrawn from waters near a technological platform, in the «bucket» proceed to the formation of tow orders for further movement at the first pre-prepared process approach canal, then across the Kerch approach channel and then directly to the Kerch-Yenikalsky channel.

The excitement of the sea at the moment, 10-12 cm, which is much less than the maximum allowable calculated at 1 meter, noted the press service. The forecast for the next two days is favorable. The operation of transporting will last all day on August 27.

The length of the span of the arch is 227 meters. Height at the highest point is 45 meters. Width of the axes of arches 20 metres to cross 5 meters-castle (highest point). Total weight — more than 6 thousand tons. The movement of trains is provided in 2 ways. The design provides for viewing the moves, cable construction, drainage trays, lightning protection and grounding, monitoring system of engineering structures, air navigation and vessel alarm system, centralization and blocking (SCB), communication and lighting poles, architectural lighting.

The bridge across the Kerch Strait that will link Crimea and Krasnodar Krai, will be the longest in Russia — its length is 19 kilometers. The beginning of the movement of vehicles on the bridge is scheduled for December 2018.

Read more about news of the Crimea — on crimea.ria.ru>>The arch of the bridge in the Crimea began to be transported to the Seine estuary supportsWhat is the bridge across the Kerch Strait

Source

Be the first to comment on "The arch of the bridge in the Crimea began to be transported to the Seine estuary supports"

Leave a comment

Your email address will not be published.


*