The Orenburg region is fully ready for the heating season

© Fotolia / Özgür GüvençСистема heating. Archival photoThe Orenburg region is fully ready for the heating season© Fotolia / Özgür Güvenç

In all municipal formations of the Orenburg region began the heating season, reported RIA Novosti the representative of the press service of the Governor and government of the region.

«Winter is a crucial period for all services in the region, and therefore, how well and timely training will be provided, depends on smooth functioning and the viability of the territories during the peak load. Objects of housing and communal services and social sphere of the region ready to work. In case of extraordinary situations the connection will be restored within the prescribed time period,» said the Governor of the region Yuri Berg in the course of conference calls chaired by the Deputy Chairman of the government of the Russian Federation on construction and regional development Vitaly Mutko.

The press service noted that in the region for the heating season has trained more than 2.5 thousand of boilers and 204 of the Central thermal points. In addition, in the area of arrangements of the 38 kilometres of thermal networks, 62 kilometres of water mains and 37 km of gas pipelines were repaired almost 500 kilometers of electric networks and transformer substations of 467. Stock backup liquid fuel for CHP and boilers is 75.2 thousand tons — 100% of regulatory reserves.

To ensure continuity of operations in case of emergency prepared 108 322 mobile and stationary backup power supply of the power from 5 to 500 kilowatts.

The press service added that in the region for the period of the heating season will work Edinaya dezhurno-dispatching service GU Ministry of emergency situations of Russia across the Orenburg region.

Source